Past Projects - St. Joseph's
Hospital
ST. JOSEPH’S HOSPITAL
Highland, Illinois
Contract Amount: $1,100,000
Completion: December, 2008
Major Components: Health/Life Upgrades, Remodel and Lobby
addition. Make Up Air
System On Floors 1 Through 4. Compliance with all Interim Life
Safety Measures (ILSM) and Illinois Department of Public
Health
(IDPH) regulations.
Architect: Berners-Schober Associates, Inc., Green Bay,
Wisconsin
Owner: St. Joseph’s Hospital of the Hospital Sisters of the
Third Order of St.
Francis, Highland, Illinois



We have performed health/life
upgrades as well as built a new lobby and
entrance to St. Joseph’s Hospital. Included in the project was
a new make-up air system for Floors 1 through 4.
In order to keep the hospital in full operation throughout the
project, compliance with ILSM and IDPH regulations during
construction was imperative.
The project was conducted in phases so that construction
areas could be completely isolated from the rest of the
hospital.
As part of the new Lobby renovation, a new canopy, drive-thru
ambulance entrance to the Emergency Room and sidewalks were
included.
>> Click
Here to return to the projects page
.........................................................................................
Site Map |
Home |
About Us |
Services |
Projects |
Client Testimonials |
Construction |
Contact Us
Copyright ©2009 KorteLuitjohan.com. All rights reserved.
Legal.
Contractor Website Design by
Delta Creations |