Water Reclamation Facility UV

Belleville, IL

 

  • Construction of pre-engineered metal building (PEMB) and separate electrical building
  • Installation of six UV units, totaling 3,000 bulbs
  • A 23 x 23 addition to the existing stormwater management basin

 

Completed November 2023